skip to Main Content
Calculations
Electricity Cost (kw/hr)
Depth/TDH (ft)
Gallons per Minute
Hours/day
/
Head Loss (ft) Operating Cost (USD/hr) Yearly Savings
Size (in) Velocity (ft/s) Wellhose Steel Wellhose Steel (USD)
1"
1.25"
1.5"
2"
2.5"
3"
4"
Sorry but your depth and GPM combination are too much for the Boreline to handle. Please use a smaller GPM or shallower depth setting.
Back To Top